← PROJECTS
Dual-circuit rail loading lines
Sector
Quarry
Technology
Rail loading lines
Country
France
The project
Installation of two train loading lines for a quarry, a sand circuit and a civil engineering circuit, including the conveyors feeding two loading shuttles each able to serve the six tracks.
Our solution
Two independent loading lines, each fed by its own conveyors, feeding two bidirectional loading shuttles covering the six tracks.
Specifications
Circuits Sand and civil engineering, independent
Loading shuttle 1,200 x 15.3 m, bidirectional travel
Tracks served 6 tracks per shuttle
Storage stacker 800 x 19 m